How to organize a job handover: the complete guide
A job handover is planned backward from the departing employee’s last day. Their manager runs it in five steps: name who receives the handover document, have it written at the start of the notice period (préavis), review it halfway through, have the departing employee and the successor work side by side in the last week (the overlap period), then check the document six weeks after the departure.
Contents
- Key takeaways
- What a handover passes on
- Who does what during the handover
- The timeline, from the announcement to the month after
- A handover plan to copy
- The handover steps, file by file
- What goes in the handover document
- One successor, several, or none
- If your situation is not the general case
- Frequently asked questions
Key takeaways
- As soon as the departure is announced, the manager names who receives the handover document, books two overlap meetings and tells IT.
- In the first week of the notice period, the departing employee starts the handover document from their calendar and sent emails.
- Halfway through the notice period, the manager reviews the first draft, names one person to take over each file and decides who tells the clients.
- In the last week, the departing employee and the successor hold the overlap meetings; the successor’s access is tested before the last day.
- Six weeks after the departure, the successor and the manager check the monthly tasks and add what was missing to the handover document.
What a handover passes on
A job handover is the transfer, by the person leaving a role, of what someone needs to know to do it: open files, people, deadlines, access rights and the rules nobody wrote down. It starts when the departure is announced and ends when the successor can run the role alone.
The document that carries it is called the handover document here. Companies also call it a handover file, handover sheet or handover report. The handover template gives the outline to fill in. The person taking over a file is either the successor or, when the role is split, a colleague.
This page covers a planned departure, with a known period before the last day: a resignation or retirement notice period, the time frame of a rupture conventionnelle (mutual termination agreement), the date of an internal move. For sick leave or an accident that leaves the role vacant overnight, start from the page on long unplanned absences.
Who does what during the handover
The departing employee’s manager runs the handover. Without the manager, nobody names who takes over each file or sets the time aside, and the document gets written on the last evening.
| Who | What they do | When |
|---|---|---|
| The manager | Names who takes over each file, books the meetings, reviews the first draft, decides who tells the clients | As soon as the departure is announced, then halfway through the notice period |
| The departing employee | Writes the handover document, introduces the successor, moves their working documents to a shared space | During the notice period |
| The successor | Reads the handover document, asks questions, logs in with their own credentials | During the overlap and the first month |
| HR | Works out the end date of the notice period, prepares the end-of-contract documents, tells IT | As soon as the departure is announced |
| IT | Sets up the successor’s access, tells the departing employee when their account will close | Before the last day |
The timeline, from the announcement to the month after
The timeline is counted back from the departing employee’s last day. It works for a notice period of one month or more. With less time, keep the order and start with the files due in the next 30 days. How long each step takes, and how much time each type of departure leaves, are on the page How long does a job handover take.
The two meetings in the last week make up the overlap period. The page on the handover overlap period explains how to run those days together, and when you need two weeks rather than half a day.
As soon as the departure is announced
The manager and HR
Name who receives the handover document (the successor, otherwise the manager); book the two overlap meetings; tell IT
First week of the notice period
The departing employee
Start the handover document from the calendar and the sent emails of the last 12 months
Halfway through the notice period
The manager
Review the first draft; name one person to take over each file and each deadline in the next 60 days; decide who tells clients and suppliers
Last week
The departing employee and the successor
First overlap meeting, 3 hours, section by section; the successor’s access set up and tested
Last day
The departing employee
Second meeting, 90 minutes, on the points still to confirm; out-of-office message naming the person taking over; handover document saved in a shared space
Two weeks after
The successor and the manager
Go back over the points still to confirm; add to the document what it did not say
Six weeks after
The successor and the manager
Check the monthly tasks; end the forwarding of the departing employee’s emails
To check off before the departing employee’s last day
A handover plan to copy
The handover plan tracks each file until the person taking it over runs it alone. It comes in two tables, one row per file in each: who takes the file over and its next deadline, then the date of each handover step. In a spreadsheet, put them side by side.
The three rows are an invented example: an administrative manager leaves on December 12, and their manager reviews the plan every week of the notice period.
| File | Taken over by | Next deadline |
|---|---|---|
| Forklift rental | Julie M. | Notice to terminate before January 31 |
| Client Vercors Emballages | Julie M. | Price review on December 5 |
| Filings on the tax portal | Marc T. | Next filing on December 15 |
One name per row, never a department. A file nobody has taken over stays with the manager, whose name goes in the departing employee’s out-of-office message.
The handover steps, file by file
Date each cell on the day the step is done. A row is closed when every cell holds a date or “not applicable.”
| File | Reviewed with the departing employee | Contacts told | Access opened for the person taking over |
|---|---|---|---|
| Forklift rental | November 14 | Rental company told on November 18 | Rental company portal, November 20 |
| Client Vercors Emballages | November 14 | To do | Not applicable |
| Filings on the tax portal | November 21 | Not applicable | To do (the access is in the departing employee’s name) |
What goes in the handover document
What gets lost when an employee leaves is rarely the files. It is the things they did without writing them down. When she left Facebook, Deb Liu counted more than twenty tasks she handled that appeared nowhere in her written responsibilities1.
The handover document makes them visible in eight sections, in the order the successor needs them. The handover template gives instructions and an example for each; the 40 questions to ask your predecessor follow the same order.
- The role and its scope: what is part of it, what is not, a typical week.
- The people: the 8 to 12 contacts, what they expect, how to reach them.
- Tools and documents: where they are, who grants access.
- Open files: where each stands, the next action, the deadline, who is waiting.
- The calendar: what recurs every month and every year, with the next date.
- Decision paths: what the role decides alone, what is escalated, and to whom.
- Problems and pitfalls: the unwritten rules, the tasks done without any written request.
- History and next steps: what has already been tried, the priorities for the first month.
The people
- Vercors Emballages pays at 45 days, a term agreed verbally in 2025 in exchange for an annual volume. Taken over by Julie M.; without this line, she would chase an invoice that is not late.
The calendar
- Forklift rental: notice to terminate before January 31, otherwise renewed for a year. Taken over by Julie M.; rental company told on November 18.
Problems and pitfalls
- The tax portal is in the departing employee’s name: access closes with their account. To be opened in Marc T.’s name before the last day, otherwise the December 15 filing is blocked.
What does not go in a handover document: a password, an opinion about a person, health, salary or private-life data. Documents stay where they are; the handover document says where to find them.
One successor, several, or none
The handover changes shape with the number of people taking over. Deb Liu distinguishes three cases: all the work taken over by one person, the work split among several colleagues, and nobody to take over1.
| Situation | What changes |
|---|---|
| One successor | The handover document goes to them, and the overlap period is held with them. |
| Several people take over | One name per file; the handover task list says who takes over what. |
| Nobody yet | The manager receives the handover document and the access, and is named in the out-of-office message. Under French law, a CDD (fixed-term contract) can cover the wait for a successor hired on a CDI (permanent contract)2: see overlap and fixed-term contracts. |
If your situation is not the general case
Six situations change the handover enough to have their own page.
| Situation | What changes | The page that covers it |
|---|---|---|
| The departing employee has already left | The handover document is pieced back together: the same questions to the manager and two colleagues, answers compared | Taking over a role with no handover |
| The employee is moving to another role in the company | They stay reachable: two dates to set between the two managers | Handover for an internal transfer |
| The departing employee is a key person | What to secure in the ten days after the announcement | When a key employee leaves |
| They are leaving for a competitor | What gets handed over, and what gets protected | Leaving for a competitor |
| Nobody in-house can run a senior management role | An interim manager arrives with no overlap | Interim manager |
| The departing employee’s mailbox still needs handling | What the employer may read, and when to close the account | The mailbox of an employee who has left |
Frequently asked questions
What else is a job handover called?
In English: a handover, a job handover, a handoff or a transition of duties. In French companies: passation de poste, passation de fonctions or transmission de poste, and passation de service in the French civil service. The overlap period (tuilage in French) is not a synonym: it is the time when the departing employee and the successor work at the same time, and is part of the handover.
What document do you need for a job handover?
A handover document, also called a handover report or handover sheet: eight sections, 6 to 10 pages depending on the role, by our estimate. If several colleagues take over the role, add a handover task list that names one person per task.
When should a job handover start?
As soon as the departure date is known. The handover document is started in the first week of the notice period, so the manager has time to review the first draft before the overlap period.
Does the departing employee have to do the handover?
Under French law, the employment contract continues as normal during the notice period until it ends3: plan the handover as one of the tasks of the notice period, with time blocked out in the calendar. What the employer can ask, and its limits, are on the page Training your replacement during your notice period.
Read next
- Handover template
- How long does a job handover take?
- Handover overlap period: length, cost and French rules
- Job handover report: template and filled-in example
- Employee offboarding checklist
- 40 questions to ask your predecessor
Sources
- [1] Deb Liu, Substack, “The Art of the Handoff”, published on September 28, 2021, accessed on November 3, 2026. debliu.substack.com
- [2] Code du travail (French Labor Code), Article L1242-2, 1° e (fixed-term contract pending the arrival of the employee hired on a permanent contract), in French, version updated on August 12, 2018, accessed on November 3, 2026 on the Code du travail numérique. code.travail.gouv.fr
- [3] Service Public, “Démission d’un salarié” (“Resignation of an employee,” in French), page checked by Service Public on July 8, 2026, accessed on November 3, 2026. service-public.gouv.fr