Handover task list
A handover task list sets out the tasks that recur in a role, one per line, with how to do each one, the file or tool, the person who takes it over and the next due date. Here is a filled-in list for a role split between three colleagues during maternity leave.
Key takeaways
- It is used when several people share a role: leave, a departure with no named successor, an internal move.
- For each task: how to do it, where (file or tool), the owner, meaning the person who takes it over, and the next due date. Daily tasks also have a backup, who does them when the owner is away.
- Tasks are grouped by frequency: daily, weekly, monthly, quarterly or yearly, and on request.
- Build the list from the last 12 months of calendar entries and sent emails: a yearly task shows up only once.
- It does not replace the handover document, which covers open items, people and pitfalls.
The template, with a worked example
Fictional example: Mathilde Caron, engineering department assistant at Sertec Ingénierie, goes on maternity leave on Friday, February 12. Her tasks are split between Paul Guérin, technician, Leïla Benamar, sales assistant, and Romane Duval, head of the engineering department. Copy the sheet, then replace the tasks with yours, one row per task.
| Task | Where | Owner | Next due |
|---|---|---|---|
| Daily | |||
| Log the drawing requests received in the shared design@ mailboxOne row per request, with the customer and the requested date | Request_tracking.xlsx | Leïla Benamar Backup: Romane Duval | February 15 |
| Answer customers who ask how their drawing is progressingRead the Status column; never promise a date without Romane | Request_tracking.xlsx | Leïla Benamar Backup: Romane Duval | February 15 |
| Weekly | |||
| On Mondays at 9 am, prepare the workload plan for the 4 techniciansCopy the previous week’s tab, add the accepted requests | Engineering_planning.xlsx | Paul Guérin | February 15 |
| On Thursdays, send the approved drawings to the printer for the site filesSave the drawings as PDF, then email them to the printer | Outgoing folder | Paul Guérin | February 18 |
| Monthly | |||
| On the 3rd, record the hours spent per project for invoicingExport the hours, send them to accounting before the 5th | Time-tracking software | Romane Duval | March 3 |
| On the last Friday, archive the drawings of closed projectsMove the project folder to Archives, current year | Archives folder | Paul Guérin | February 26 |
| Quarterly and yearly | |||
| In March, renew the 6 drawing software licensesHave Romane sign the reseller’s quote; the deadline is March 31 | Reseller’s email | Romane Duval | Quote expected on March 1 |
| Each quarter, update the list of standards that apply to the drawingsCompare it with the list received from the main customer | Drawing_standards.docx | Paul Guérin | April, to be confirmed |
| On request | |||
| Book the room and equipment for drawing reviews with a customerAsk reception for the projector the day before | Engineering department shared calendar | Leïla Benamar | When requested |
| Create the folder for a new projectCopy the Project_template folder, rename it with the job number | Projects folder | Paul Guérin | When requested |
How to fill in the list
One owner per task
A name, never a department. Add a backup for daily tasks.
Built from the calendar
Go through the last 12 months of calendar entries and sent emails: yearly tasks show up only once.
How to do it, in one sentence
One sentence that gives the action and the file. If it takes more, write a procedure and give its location.
The next due date
For each task, the first time the owner will do it alone.
ExampleHours report: March 3.
Recurring tasks, not open items
The list covers what recurs. Open items, people and pitfalls go in the handover document.
Access before the last day
Each owner tests their access to the files and shared mailboxes before the last day, with their own credentials.
Frequently asked questions
What is the difference between a handover task list and a handover document?
The task list sets out the recurring tasks, one per line, with their owner. The handover document covers the rest: open items, people, upcoming decisions, pitfalls; its structure is on the job handover template page. When one person takes over the role, the handover document is enough; when several colleagues share it, add the task list.
Handover task list: Word or Excel?
This page sends the list in Word and PDF, not Excel. The file has one table to fill in per frequency: the five columns of the list, plus the backup and an “Access tested” box. To sort the tasks by owner or by date, copy these columns into a spreadsheet.
How do you split the tasks of an employee who is leaving?
List all the tasks first, then give each one to the person who already has the tool or the contact. The manager approves the split and checks that nobody gets more than their own role leaves time for.
How do you announce the split to colleagues?
With an email from the leaver, once the manager has approved the split, pointing to the task list: email 5 of the handover email templates is an example.